PROTECTING YOUR BUILDING INVESTMENT
Century Building Solutions, Inc.
5442 E. Olympic Boulevard
Commerce, CA 90022
562.941.7900
info@centurybsi.com

Taco Bell Headquarters

A six-story low-rise building that serves as the headquarters for restaurant company Taco Bell
Location Irvine, CA 92618
Scope Of Work Waterproofing, Caulking, Coating
Schedule 2011

Project Detail

Base concrete repair and epoxy coating – The base level of concrete had areas with major cracking and chipping corners. It was predetermined that along with repairing all the cracks a base coating would also be applied to protect from future damage. It all started with the removal of the debris around the cracks and a preparation of the area to be repaired. The concrete repair mortar was then used to fill all cavities as well as reform corners. After sanding was done to smooth out the surface two coats of Amerlock 2 epoxy based coating was applied. The job was finished off with a bead of Sikaflex1A in black at the base of the wall.

 

Wall Leak Repairs – Some of the walls of the building had leaks from within which were caused by some failed caulking at the metal fascia support brackets. Now all this water in the walls and inside of the building was causing issues and if not resolved it could result in more damage. Our job was to come in and repair this issue and we also caulked the perimeter of the light mounting boxes with Dow Downing 795 professional grade silicone sealant.